DateProject No.DescriptionAmount   
15/10/2014Mathssupplying and installation of brand new compressor capacitor for the wall mounted air conditioner (Capacity 24000Btu/hr)
Repairing the Gas leak, pressurized with N2, Vacuum the system, Charge R22 Gas (Capacity 24000Btu/hr)
18,000.00
19/02/2015MathsSupplying and installation of wall mounted Air Conditioner Arm Flex Insulation, 3Core Wire, Duct Tap, Bracket, Copper Piping (13meters) and gas filling13,750.00
07/08/2015MathsRepairing a Multimedia Projector4,500.00
10/03/2014Project 06Water Dispenser10,000.00